#5 - Building a New Court - Dec. 26 2011 through May 29, 2012
Jan 7, 2012Public
Photo: 12-26-2011 8:43 am. Construction begins.
Video: Video clip 1:17 minutes. 12-26-2011. Tree removal begins at 9:00 am
Photo: Finishing debris removal - 3:00 pm 12-26-2011
Photo: 12-27-2011 8:53 am. Initial leveling the playing surface, with the help of laser equipment.
Video: Video clip 0:45 minutes, 8:53 am 12-27-2011. Initial leveling the playing surface, with the aid of laser equipment.
Photo: 12-27-2011 8:53 am.  Initial leveling the playing surface
Photo: 12-27-2011 8:52 am. Initial leveling the playing surface.
Photo: 12-27-2011 3:53 pm. Initial leveled playing surface from northeast corner.
Photo: 12-27-2011 3:50 pm. Initial leveled playing surface from southeast corner looking north.
Photo: 12-27-2011 3:51 pm. Initial leveling completed, from southeast corner looking west.
Photo: 12-30-2011 8:50 am. Adding 6 inches of 50/50 (sand/loam) top mix.
Photo: 12-30-2011 8:31 am. Adding 6 inches of 50/50 (sand/loam) top mix.
Photo: 12-30-2011 8:32 am. Adding 6 inches of 50/50 (sand/loam) top mix.
Photo: 12-30-2011 8:42 am. Adding 6 inches of 50/50 (sand/loam) top mix.
Photo: 12-30-2011 8:45 am. Adding 6 inches of 50/50 (sand/loam) top mix.
Video: 12-30-2011 8:45 am. video 0:44 minutes.  
Adding 6 inches of 50/50 (sand/loam) top mix.
Photo: Before New Court - March 2011
Photo: After New Court completed on December 30, 2011, at 3:00 pm
Video: Video clip 0:50 minutes. Pan of completed court. January 6, 2012.
Photo: Panorama from southwest corner - 1-6-2012
Photo: Panorama from northeast corner - 1-6-2012
Video: Video clip 0:26 minutes 1-3-2012. Shows very flat final grade
Photo: From Clubhouse Restaurant - 1-3-2012
Photo: May 26, 2012 - water line is extended to new court to supply eventual in-ground irrigation.